Estimating the Dream
By Brian Hale.
Updated November 10, 2026 by Stephen Lease, Vice President.
Clients often come to us with their dream of a new office that they have envisioned. We take pride in making this dream office come true. Oftentimes, there is a great lack of information that we as estimators need to have to provide accurate pricing for this office. Because of this, we have to "take a stab" at specifying the desired plan of the space presented to us.
Start with a floor plan
Let's start with the basics: a simple floor plan. The floor plan is the base plan for any office. It includes walls, plumbing fixtures, cabinetry, doors, equipment, and labeled rooms. A floor plan is the first element required for a new office. This can be provided by the client through a space planner, architect, or equipment supplier, and we can help you find one. The floor plan is the first step of office planning because it shows the client their ratio of revenue-generating areas versus non-revenue-generating areas. That holds whether the office is a tenant finish-out or a new building.
Texas Accessibility Standards
There are many restrictions imposed on a new commercial space by the Texas Accessibility Standards (TAS). These are state standards that must be followed in most jurisdictions in Texas. There are accessibility clearances that must be maintained throughout most of the office. Our article on leasing obstacles lists the ones we see most often. Sometimes, when these standards are not complied with or are ignored, it can spell disaster for the tenant and the building owner when attempting to pass inspection at the end of a project with a TAS review.
This is ultimately the responsibility of the owner of the property being constructed on. The Texas Department of Licensing and Regulation (TDLR) enforces the standards, and its published penalties for building owners run from $500.00 to $5,000.00 per violation. A project with an estimated construction cost of $50,000.00 or more must be registered with TDLR and reviewed and inspected for compliance, and smaller projects must still comply. For this reason we stress that the floor plan designer make every effort to comply prior to estimating.
When a plan does not comply
If a plan for construction comes to us for estimating and clearly does not comply with TAS, we make every effort during estimating to make our clients aware of the problems with the plan and suggest solutions. Some of the biggest offenders are plans which do not have wide enough doors to offices or closets, restrooms that do not have the proper fixture clearances, rooms that do not have proper maneuvering clearances, and doors that do not have the proper clearances on their lever side.
Some of these problems can be corrected during construction, but better planning from the beginning can save valuable time and money. Lastly, compliance with all regulations also keeps all of your clients and employees with disabilities more comfortable while spending time in your office.
Common questions
What do you need from me to start an estimate?
A floor plan. It shows the walls, plumbing fixtures, cabinetry, doors, equipment, and labeled rooms. A space planner, architect, or equipment supplier can provide it, and we can help you find one.
Who is responsible for meeting the Texas Accessibility Standards?
The owner of the property being built on. The Texas Department of Licensing and Regulation enforces the standards, so we ask the floor plan designer to make every effort to comply before the plan is estimated.
What accessibility problems show up most often on plans?
Doors too narrow for offices or closets, restrooms without the proper fixture clearances, rooms without proper maneuvering clearances, and doors without the proper clearance on the lever side. Some can be corrected during construction, but catching them in planning saves time and money.
Planning a new building, a finish-out, or a renovation? Tell us about it.