Dental · Colleyville and Grapevine, Texas

Dental construction in Colleyville and Grapevine

Structures and Interiors, Inc. built Family Tree Dentistry on Precinct Line Road and Vinings Dental on Colleyville Boulevard in Colleyville, and Grapevine Dental Care on Ira E. Woods Avenue in Grapevine.

Dental projects in and near Colleyville and Grapevine

Vinings Dental and Grapevine Dental Care are freestanding buildings, and Family Tree Dentistry is a building with space beyond the practice. North of them, in Southlake, we have built more dental offices than in any other city, including Munilla Dental and Darnell Dentistry.

Building in Colleyville and Grapevine

Colleyville is the city directly south of our Southlake office, and Grapevine is the next city to the east. We have built two dental offices in Colleyville and one in Grapevine. Vinings Dental and Grapevine Dental Care each have a freestanding building, with its own roof, sign, and parking. Family Tree Dentistry's building has room for more than the practice: 3,300 of its 5,500 square feet is the dental office. Those are new buildings, and we also finish out and renovate dental suites in existing buildings.

Family Tree Dentistry, completed in 2013 for Dr. Doan Bui, is a 5,500-square-foot building on Precinct Line Road, and 3,300 square feet of it is the dental practice. M.J. Wright & Associates, Inc. designed the building, with a full masonry veneer, gabled fronts, and large towers, so that it reads more like a house than a clinic. Henry Schein Dental provided the interior planning and the dental equipment.

Vinings Dental is a single-story brick building with a hipped roof and a monument sign on Colleyville Boulevard. Grapevine Dental Care, on Ira E. Woods Avenue, is a single-story stucco building with a stone base, a square tower, and an arched entry porch. Its owner, Dr. Becky Coats, wrote that the project was made to work within her timeline.

A dental building of your own is a different project from a suite. The outside of the building, the sign, the parking, and the drainage are all part of the job, and each one is reviewed by the city. Inside, the dental plumbing, vacuum, and air lines can be placed before the floor slab is poured, which is easier than cutting them into a landlord's slab later.

Colleyville and Grapevine are separate cities, and each one runs its own zoning, plan review, and inspections. See how building permits work for a medical or dental office for the full sequence. For a new building the path usually runs from plat to site plan to building permit, and the exterior materials and the sign are often part of the review. S&I schedules these approvals from the start. We check the under-slab plumbing and the equipment rough-ins with the equipment supplier's installer before the slab is poured.

Colleyville and Grapevine dental construction questions

Has Structures and Interiors built dental offices in Colleyville or Grapevine?

Yes. In Colleyville we built Family Tree Dentistry on Precinct Line Road and Vinings Dental on Colleyville Boulevard. In Grapevine we built Grapevine Dental Care on Ira E. Woods Avenue. Our own office is next door in Southlake, where we have built more dental offices than in any other city.

Do Colleyville and Grapevine use the same permit process?

No. They are separate cities, and each has its own zoning, plan review, inspections, and certificate of occupancy. A property follows the rules and the schedule of the city it is in, so the first step is to confirm which city that is.

Can I build a dental building that is larger than my practice needs?

Yes. Family Tree Dentistry in Colleyville is a 5,500-square-foot building, and 3,300 square feet of it is the dental practice. If you plan extra space, decide early how it will be entered and how it will get power, water, and air conditioning, so that it can be finished and used separately from your office.

Who plans the operatories and the dental equipment?

Usually the architect and a dental equipment supplier work on it together with the dentist. At Family Tree Dentistry, M.J. Wright & Associates, Inc. designed the building and Henry Schein Dental provided the interior planning and the dental equipment. The builder needs the supplier's utility locations for each chair before the plumbing goes in.

More dental construction

See all of our dental work, or the same kind of project in a nearby city.

Building in Colleyville Grapevine? Tell us about it.

Start a project817-329-4241